BMW: The challenge

Development and assembly of B2L energy storage systems (30 to 5.000 kWh) with different OEM modules

FEV e+r: Our involvement and solution

  • System design and –architecture
  • Design of E/E-architecture and components
  • FMEA and risk analysis for ESS (CE) incl. definition of safety levels and requirements (safety concepts)
  • Software development and implementation
  • Prototypes, validation and testing
  • Assembly and start-up operations
  • Preparation of technical documents for CE certification

 

Get in touch with us through our Contact form

Similar posts

  • From Water Quality to Cell Integrity: A Comprehensive PEM Stack Forensics Study

    An industrial customer sought an independent second opinion on purchased and stored PEM electrolyzer stacks prior to installation in its electrolysis systems...

  • Copper end‑of‑life recovery pathways in data center infrastructure

    Data center growth creates large volumes of end‑of‑life copper FEV was asked to analyze recycling pathways to identify levers to improve copper preservation and circularity…

  • FEV supports BESS investment decisions through BESS Redflag Report and asset simulation

    The challenge Investors and asset owners need to understand both the current condition and the future potential of operating battery energy storage systems. The challenge is to identify technical risks, assess remaining useful life, and evaluate…