Battery energy storage systems: Development, installation, and commissioning of 2nd life systems
BMW: The challenge
Development and assembly of B2L energy storage systems (30 to 5.000 kWh) with different OEM modules
FEV e+r: Our involvement and solution
- System design and –architecture
- Design of E/E-architecture and components
- FMEA and risk analysis for ESS (CE) incl. definition of safety levels and requirements (safety concepts)
- Software development and implementation
- Prototypes, validation and testing
- Assembly and start-up operations
- Preparation of technical documents for CE certification