BMW: The challenge

Development and assembly of B2L energy storage systems (30 to 5.000 kWh) with different OEM modules

FEV e+r: Our involvement and solution

  • System design and –architecture
  • Design of E/E-architecture and components
  • FMEA and risk analysis for ESS (CE) incl. definition of safety levels and requirements (safety concepts)
  • Software development and implementation
  • Prototypes, validation and testing
  • Assembly and start-up operations
  • Preparation of technical documents for CE certification

 

Get in touch with us through our Contact form

Similar posts

  • FEV and Regout Group Collaborate on Smart Energy Management through PV–BESS Integration

    The Regout Group, a leading industrial manufacturer in Maastricht, aims to enhance sustainability and reduce energy costs. With rising electricity prices and the need for greener operations, the challenge was to identify an optimal mix of renewable energy generation and…

  • Global diesel & natural gas power generation study

    Global industrial engine manufacturer seeks tounderstand the diesel and natural gas power generation marketto evaluate further engine development.

  • Data center energy efficiency improvement study

    Silo-ed operation of all DC systems and reactive control strategies were leading to inefficient power consumption. Help identify and implement energy efficiency improvement measures.