Data center energy efficiency improvement study

Published on:

Case studies, Client solutions, Data center

1 Min. Reading time

Mid-Size US Data Center Operator: The challenge

  • Silo-ed operation of all DC systems and reactive control strategies were leading to inefficient power consumption.
  • Help identify and implement energy efficiency improvement measures.

FEV e+r: Our involvement and solution

  • Baselined target DC infrastructure and controls strategy, including systems, layout, management tools, and KPIs
  • Developed an industry technology roadmap via competitive benchmarking of 5 players
  • Theoretical preliminary evaluation and identification of efficiency gains in the target data center
  • Built and calibrated a digital twin of the data center modeling the complete power, thermal, compute systems
  • Quantified realistic efficiency improvement measures across the DC and assessed the investment required per measure
  • Developed an efficiency improvement roadmap with timing and investment plan
  • Implemented the hardware and controls upgrade, along with the establishment of KPIs

 

Get in touch with us through our Contact form

Similar posts

  • From Water Quality to Cell Integrity: A Comprehensive PEM Stack Forensics Study

    An industrial customer sought an independent second opinion on purchased and stored PEM electrolyzer stacks prior to installation in its electrolysis systems...

  • Copper end‑of‑life recovery pathways in data center infrastructure

    Data center growth creates large volumes of end‑of‑life copper FEV was asked to analyze recycling pathways to identify levers to improve copper preservation and circularity…

  • FEV supports BESS investment decisions through BESS Redflag Report and asset simulation

    The challenge Investors and asset owners need to understand both the current condition and the future potential of operating battery energy storage systems. The challenge is to identify technical risks, assess remaining useful life, and evaluate…