Select another language to see content for your location.

Target costing for stationary energy storage system

Published on:

BESS, Case studies, Technologies

1 Min. Reading time

European producer of energy storage systems: The challenge

  • Customer wants to develop a new stationary energy storage system
  • A target costing and cost reduction study was made to drive concept decisions

FEV e+r: Our involvement and solution

  • Joint workshops to discuss existing customer design solutions and potential production processes
  • Cost evaluation and prioritization of design alternatives
  • Cost forecast of selected concept based on first bill of material
  • Regular updates of cost forecast based on design changes and rising level of technical specifications during further development
  • Interdisciplinary workshops to identify cost-reduction measures
  • Detailed evaluation of identified cost reduction ideas

 

Get in touch with us through our Contact form

Similar posts

  • From Water Quality to Cell Integrity: A Comprehensive PEM Stack Forensics Study

    An industrial customer sought an independent second opinion on purchased and stored PEM electrolyzer stacks prior to installation in its electrolysis systems...

  • Copper end‑of‑life recovery pathways in data center infrastructure

    Data center growth creates large volumes of end‑of‑life copper FEV was asked to analyze recycling pathways to identify levers to improve copper preservation and circularity…

  • FEV supports BESS investment decisions through BESS Redflag Report and asset simulation

    The challenge Investors and asset owners need to understand both the current condition and the future potential of operating battery energy storage systems. The challenge is to identify technical risks, assess remaining useful life, and evaluate…